The extrusion ratio is the single number that decides whether a shank reduction can be formed in one blow, needs two, or cannot be cold formed at all. It is also the number most often left off the drawing, which is why shank-reduction dies fail in ways that look like material defects but are really a geometry problem.
The ratio compares the cross-section before forming with the cross-section after forming. If a wire of diameter D0 is reduced to a shank of diameter D1, then the extrusion ratio is the ratio of the two areas, not the two diameters:
R = A0 / A1 = (D0 / D1) squared
A 10 mm wire reduced to 8 mm looks like a 20% reduction in diameter, but it is a 36% reduction in area, and the die sees the area. Confusing diameter ratio for area ratio is the most common mistake we see in incoming enquiries.
Three things break when the ratio gets too large:
For a well-annealed low-carbon wire in a single blow, the practical ceiling sits around 1.4 to 1.5. Above that the process becomes unreliable even if the press has the tonnage.
These are the working limits we use when quoting. They assume good quality wire, proper lubrication and a die with a generous approach angle.
| Material | Single blow, max R | Notes |
|---|---|---|
| Low carbon steel (1008-1018) | 1.4-1.5 | Most forgiving, annealed condition |
| Medium carbon (1035-1045) | 1.3-1.4 | Spheroidise anneal improves the ceiling |
| Boron steel (10B21, 10B38) | 1.3-1.4 | Common for property class 8.8 and 10.9 |
| Alloy steel (40Cr, 35CrMo) | 1.25-1.35 | Two blows usually cheaper than one hard blow |
| Stainless (304, 316) | 1.2-1.3 | Work hardens fast, keep the reduction conservative |
| Copper T2 / brass | 1.5-1.6 | Very ductile, but galling risk is high |
Take an M10 flange bolt with a reduced shank. Wire diameter 9.6 mm, shank diameter 7.2 mm.
Area ratio: (9.6 / 7.2) squared = 1.78. That is well past the single-blow ceiling for medium carbon steel, so a one-blow shank die will either crack its casing or tear the part internally.
Four ways to make it work, in the order we would evaluate them:
If a customer insists on one blow, we will say no and explain why. The failure mode of an over-loaded shank die is not a worn die, it is a cracked casing and a damaged machine, and the cost lands on the customer. The honest alternatives are always one of these four: more stations, smaller wire, softer material, or a different die architecture.
The ratio is set by the part, but the achievable ratio is set by the die. Five details matter:
Together these are worth more than a grade change. A correctly profiled HSS die will out-perform a badly profiled carbide one on a marginal reduction, and cost less doing it. The die material selection guide covers how the grade interacts with these choices.
Send us the bolt drawing, the wire grade and the machine model. We will calculate the ratio at every step, tell you whether one blow is realistic, and if not, propose the station split. For the forming side rather than the reduction side, see cold heading dies and cold forging die.
To check a specific reduction before you send us anything, use the free extrusion ratio calculator — it returns the area ratio, true strain, minimum blow count and a suggested station split.